Overview

JRK Infratech successfully executed the Mukne Dam infrastructure project for Ashoka Buildcon Ltd. in Nashik, Maharashtra, delivering critical jackwell and bridge construction works as part of the overall water-infrastructure development.

Completed in 2019, the ₹1.5 Cr project was executed on a tight programme using JRK's own fleet of equipment and in-house engineering expertise.

Project Description

Delivered end-to-end by one accountable team.

By managing execution internally as the civil contractor, JRK maintained complete control over quality, safety, project timelines and cost efficiency across the jackwell and bridge works that formed the core of the Mukne Dam water-infrastructure scope.

Heavy civil works of this kind demand equipment and engineering discipline on site from day one. JRK deployed its own fleet and in-house engineering to execute the jackwell and bridge construction to programme, holding tolerances and safety on a tight schedule and in demanding site conditions.

The result was a successful, on-time delivery of the ₹1.5 Cr water-infrastructure scope to the client's satisfaction in 2019 — a clear demonstration of JRK's capability in heavy civil, water and bridge infrastructure construction.

Scope of Work
  • Jackwell construction
  • Bridge construction
  • Water-infrastructure civil works
  • Commissioning & handover
How We Delivered
  • Own construction equipment
  • In-house engineering teams
  • Quality benchmarks & lab testing
  • On-programme handover
Services Provided
Survey · Civil · Quality Assurance · Commissioning
The Outcome
Mukne Dam₹1.5 Cr, delivered for Ashoka Buildcon Ltd. and handed over in 2019.