ABE-02
Delivered for Ashoka Buildcon Ltd. · Indira Nagar, Nashik, Maharashtra
JRK Infratech delivered ABE-02, a ₹23.46 Cr commercial construction project, for Ashoka Buildcon Ltd. in Nashik, Maharashtra. As the civil contractor, we executed the build end-to-end — from planning and setting-out through to final commissioning and handover.
Delivered over two years and completed in 2024, the project was run on JRK's own equipment and in-house engineering, giving us full control over quality, safety, timelines and cost.

Delivered end-to-end by one accountable team.
As a commercial building contractor, JRK took ABE-02 from concept planning through structure and finishing to a snag-free handover. The scope spanned site development and excavation, RCC structure and foundations, building services and multilevel provisions, and finishing — each stage sequenced so the programme never waited on the previous trade.
Execution ran on JRK's own fleet of earthmoving, concrete and lifting equipment, supported by in-house engineering and precise setting-out. Owning the plant meant no rental bottlenecks and full control over the pace of the build, while a dedicated site team held the ₹23.46 Cr commercial project to strict quality benchmarks with regular audits and lab testing of materials.
Delivered over two years and handed over in 2024, ABE-02 was completed on programme and to the standard a Grade-A commercial building for Ashoka Buildcon demands — a reference project for JRK's commercial construction capability in Nashik.
- Site development & excavation
- RCC structure & foundations
- Services & multilevel parking
- Finishing & handover
- Own construction equipment
- In-house engineering teams
- Quality benchmarks & lab testing
- On-programme handover