JRK Infratech delivered The Flora for The Avenue Builders in Nashik, Maharashtra — a ₹13.60 Cr residential construction project executed end-to-end, from planning and setting-out through to final commissioning and handover.
Completed in 2025 over a two-year programme, the build was run with JRK's own equipment and in-house engineering, keeping control over quality, timelines and cost.



Delivered end-to-end by one accountable team.
As a residential construction contractor in Nashik, JRK took The Flora from foundation and RCC structure through blockwork, plaster and finishing to a snag-free handover for The Avenue Builders. Every stage — from setting-out to the final finishes — was executed by one accountable team.
The build ran on JRK's own equipment and in-house engineering, keeping timelines, quality and cost under our control across the two-year programme. Regular quality checks and material testing held the structure and finishes to standard as the towers went up.
Completed in 2025, the ₹13.60 Cr residential project was handed over on programme and to the quality a modern residential development expects — sale-ready and finished to a high standard.
- Foundation & RCC structure
- Blockwork & plaster
- MEP & services
- Finishing & handover
- Own construction equipment
- In-house engineering teams
- Quality benchmarks & lab testing
- On-programme handover
